07 / PRODUCTION & ASSEMBLY

Production

Parts, circuit boards, software and hardware matching and assembly are connected together to advance the prototype to the delivery of the complete machine.

Single entrustment is possible · Can be connected to subsequent R&D and processing
Manufacturing workshop on-site data provided by the company

Service content

How can this service help you?

Connect parts production, circuit board hardware, software supporting, assembly and trial production according to project needs. First check the prototype and data, and then confirm the procurement division of labor, version, test requirements and batch plan; if there is a ready-made plan, you can continue to promote it, or you can start from the design and development.

YOUR NEEDS

Suitable for these needs

  • 01The prototype has been confirmed and trial production and assembly need to be organized
  • 02Requires shell, circuit board and software matching
  • 03Requires production, assembly and delivery of products in batches

YOUR DELIVERABLES

What will you get?

  • 01Confirmed parts list and version information
  • 02Software, hardware and assembly matching within the agreed scope
  • 03Trial production prototype and problem handling records
  • 04Complete machine tested, packaged and delivered as agreed
Confirm the final delivery list, format and acceptance method by project.

Before starting, prepare these

  1. 01

    Confirm prototype, drawings and parts list

  2. 02

    Function description, software and hardware status and testing requirements

  3. 03

    Procurement division of labor, quantity batches and delivery plan

Look at pictures and actual work

Put the work into practice.

Advancing around specific products and uses, each stage has results that need to be confirmed.

Teams collaborate around prototypes and data

First align all the links

Clarify the input and division of labor in design, electronics, procurement and assembly, and use the same version of information to communicate.

Manufacturing equipment and on-site supporting information

Parts production is planned

Arrange batches in conjunction with materials, equipment, and quantities so that parts match the assembly schedule.

Assembly diagram of housing and electronic devices

The whole machine, not just a set of shells

Circuit boards, software functions, structural fixation and complete machine testing need to be jointly confirmed before trial production.

How do we advance

  1. 01

    Check the prototype and documents to clarify the division of labor among all parties

  2. 02

    Prepare parts, software and hardware, and complete trial assembly

  3. 03

    Trial production and testing, dealing with discovered problems

  4. 04

    Confirm the version and deliver it according to batch production

Confirm first before starting work

Quotation and construction period

Key materials, functional development, prototype confirmation and trial production results affect the overall plan. Schedule procurement, supporting research and development, assembly testing and batch delivery in stages.

Send information and evaluate the project ↗

FAQ

Can the circuit board and software be matched together?

Can be assessed by project needs. Please describe the functions, interfaces, power supply, existing solutions and content that needs to be developed; the respective delivery scopes of hardware, software, structure and testing will be confirmed separately.

Can I start with a small batch and then expand the quantity?

Batch plans can be developed based on product maturity and material conditions. First, check assembly, function and production issues through trial production, and then confirm subsequent batches to avoid rework caused by direct mass production.

Communicate directly with your product owner

Get in touch

Send photos, drawings or requirements descriptions, and confirm together how to do it, what to deliver, and how long it will take.