← Return to news

Manufacturing practices / INDUSTRY NEWS

Key points of the integration of informatization and informatization: Let R&D data be truly connected to manufacturing

Digitization is more than just buying software. For product projects, first clearly manage drawing versions, problem records and delivery lists.

Message date Source:Ministry of Industry and Information TechnologyCompiled by co-creators:
Real shots of automated production lines and industrial robots
Industrial automation themed pictures, not Xiechuang Factory; also used in the background of news columns.
Picture:Simon Kadula / Unsplash · Unsplash License

Message summary

What happened

The Ministry of Industry and Information Technology released the 2025 work points for the integration of informatization and industrialization on July 11, 2025, covering the digital transformation of manufacturing, digitalization of small and medium-sized enterprises, intelligent manufacturing and industrial Internet. This article combines this open policy direction to discuss data management practices that product development teams can implement, without involving application qualifications or policy subsidy commitments.

Co-creator’s observation: Reduce version inconsistencies first

In a project, appearance models, structural models, engineering drawings and processing files may be maintained by different personnel. If only one of them is updated after the change, the problem of "making new parts based on the old drawings" will easily occur later. Digital management should first solve the three problems of who confirms, which version to confirm, and who to hand over.

Every time you send a picture to the outside world, it is recommended to keep the version number, date, modification description, and recipients. For unconfirmed sizes or materials, use a clear TBA mark instead of letting the fabricator guess based on experience.

The delivery information should help start the next phase of work

A file that can be opened is not necessarily a file that can be processed. Units, coordinates, physical integrity, critical tolerances and necessary surface requirements need to be checked before delivery. In addition to the model, a concise list is provided to clearly describe the purpose and status of each file.

We recommend that prototype testing feedback be included in the same version record: where the problem occurred, what was modified, and whether the retest passed. For small and medium-sized product teams, these specific actions are more conducive to collaboration than stacking system names, and also provide a basis for subsequent tooled management.

Source of information

Ministry of Industry and Information Technology · 2025-07-11

The Ministry of Industry and Information Technology released the key points of work for the integration of informatization and industrialization in 2025, including 17 items in five aspects.

The public information summary and the co-creator’s editorial observations are presented separately, and the full text is not reproduced. Technical suggestions need to be verified in conjunction with specific projects; the accompanying pictures do not mean that the company participates in the mentioned events or holds the mentioned equipment.

Have specific product ideas?

Bring physical objects, drawings or requirements and decide together what to do next.

Project consultation ↗